Installation of a project vinyl floor

In order to get a perfect floor it is important to pay attention to a proper installation of the floor covering. Forbo offers an assortment of high quality installation products and tools, which helps you obtaining the desired result.
Key factors for successful installation of a resilient floor are:  
 
Sub floor preparation
The installation of a resilient Forbo floor starts with the sub floor, which must be dry, rigid and smooth. Forbo Europlan is a perfect levelling screed. Forbo QuickFit is a fast alternative sub floor system, especially in situations where sound reduction is required.
Forbo also offers a range of moisture barrier products and primers, to prepare the adhesion of levelling screed.
 
> Click here for a detailed overview of all installation products
 
Installation plan
It’s important to make a good plan before beginning an installation. Rooms, materials and sub floors must have a minimal temperature of 17 degrees Celsius (63 degrees Fahrenheit). Allow all materials to acclimatise for at least one night before installation. Forbo offers specially designed installation tools for transportation and unrolling, such as the Forbocar or the Forbo Carryset.
 
 
Scribing and cutting
A good start makes all the difference: pay extra attention to the first sheet of floor covering! A set of professional installation tools contributes to a perfect result. 
 
Adhering
A perfectly installed floor requires perfect adhesion. Within the Forbo Eurostar/Eurosafe range, high quality adhesives for every type and situation are available.
Follow the recommended open time (flash off time) from the adhesive supplier, thereafter fold the PVC sheet into the adhesive bed, rub the sheet carefully from centre to the edges in order to press the air out. If prescribed, roll the surface, first width wise, then lengthwise. Remove any excess adhesive.
After installation, make sure that the room is ventilated, in order to allow the adhesive to dry. Preferably do not use or load a freshly installed floor, until the adhesive has set thoroughly, which in normal conditions takes about two days. 
 
Welding
Welding is done for decorative and/or hygienic reasons. After the adhesive has set sufficiently, which usually takes a day, the floor can be welded by means of Forbo’s patented welding system.  
 
Finishing
To show a professional end result, the floor has to be finished and of course many high end products are available for that. Skirtings, stairnosings and transition profiles in various materials offer a way to create perfect end results. 
 


     
     